top of page

Industrial Bathroom Solutions
CALL US : 0412 153 063
VIP Packaging Brendale QLD: Relocating and upgrading service droppers.

The upgrade requires installing 50mm branch line (Chilled x 2 and Tower x 2) to the supply header pipes. These branch lines were install without shutting down the factory. Bernardi Engineering has the equipment and expertise to carry out this type of work.
bottom of page